WASTE-TO-FUEL. Investment project for the construction of a complex for the provision of the waste reception and recovery services using MBT technology
TECHNICAL INDICATORS OF THE COMPLEX:
- Complex performance – 300 thousand tons of waste per year
- Technology of mechanical and biological treatment with biodrying (MBT)
- Automatic sorting and production lines for SRF, RDF (alternative fuel)
- Use of SRF, RDF in the cement industry or thermal power
- Practical absence of unpleasant odors and birds
- Recovery depth up to 85% of total waste input
- Mass balance at input and output
- The area is 25 thousand m2
- Number of employees – 36 people.
- Design power of the equipment – 3800 kW
- Scheme of the landfill territory
- Estimated service life of the equipment – 20 years
FINANCIAL AND ECONOMIC INDICATORS:
- Project structure based on PPP
- The investment part is 34.6 million euros
- Revenue – 60.45 euros / ton
- The expenditure part is 28.41 euros / ton
- Tariffs – progressive model
- Net discounted profit of the project, NPV – 36.7 million euros
- Internal rate of return, IRR – 30%
- Design and construction period – 2 years
- The project period is 10 years
- Discounted payback period of the project, DPP – 5 years